Falcon Cluster Status

2026-03-28 01:01:01 MDT

Maintenance

Task: Security Patches
Scheduled: 9AM April 30th, 2026.
Duration: 2hours

Any new jobs that exceed this time window will be denied by the scheduler.

Completed: Security Patches, 9AM February 24th, 2025.

Queue Status


JobID User State CPU
cores
Memory
(per core)
GPUs Time Limit Time Elapsed Time Left
5009 andrey PENDING 10 110G 1 x A100 80GB 10-00:00:00 0:00 10-00:00:00
4898 saira55 RUNNING 8 32G 1 x A100 80GB 10-00:00:00 1-23:21:30 8-00:38:30
4982 saira55 RUNNING 8 32G 1 x A100 80GB 10-00:00:00 1-23:21:30 8-00:38:30
4991 andrey RUNNING 10 110G 1 x A100 80GB 10-00:00:00 2-13:39:31 7-10:20:29

Nodes Resource Usage


Node State CPUs Used CPUs Total CPU Load Memory Total (GB) Memory Free (GB) GPUs 24GB (Used/Total) GPUs 40GB (Used/Total) GPUs 80GB (Used/Total)
kestrel0 idle 0 48 0.00 117 117 0/4 0/0 0/0
kestrel1 idle 0 48 0.01 117 117 0/4 0/0 0/0
kestrel2 idle 0 48 0.00 117 117 0/4 0/0 0/0
peregrine0 down* 0 96 0.00 991 198* 0/0 0/2 0/3
peregrine1 mix- 26 96 8.12* 991 535 0/0 0/2 3/3